Usually a 110kmph Skip, but a scheduled halt for a change | Due to some ongoing works in Bhopal Jn., a lot of trains were given a 2min halt at Habibganj to compensate | The works got delayed, and the halt got extended | Also seen is BSL WAP4 hauled Habibganj Mumbai LTT express which will departed later that evening | Habibganj, November 2016
Follow the entire trip to cover the Akola Mhow MG section in this Album -
click here