8 coach will be sucess but travellers from Trissur Palakkad combined will be equal to that of ERKM and these will travel to Benguluru while Erkm travellers 50% will end up Coimbatore Salem. The dep should be 545 and not 500 as planned and should touch Coimbatore main station. I am making these assumptions will be after first 3-6 months of run as observed in my route Vskp Secunderabad.