Munger Khagaria Rail Line: डबल होगी मुंगेर-खगड़िया रेल लाइन, योजना पर खर्च होंगे 1890 करोड़ रुपयेThe Indian Railways has approved the doubling of the 14 km long Jamalpur-Khagaria (Umesh Nagar) rail line in Bihar, costing approximately ₹1890 crores. The project aims to improve connectivity and provide a more efficient railway network by addressing congestion on the single track line. The doubling will extend from Jamalpur to...
more... Umesh Nagar in the Khagaria direction, connecting to the Barauni-Katihar rail line. Additionally, a 7 km long bypass line from Ratanpur to Munger will also be doubled. This project is expected to improve train services between Munger and Bhagalpur. The project was approved in the recent budget, and a survey was conducted with ₹50 crore allocated for it. The doubling of the line and the bypass will be completed in stages, with the construction commencing soon.
Bihar mein, Jamalpur se Khagaria (Umesh Nagar) tak 14 km ki rail line ko double karne ka project approve ho gaya hai. Is project ke liye ₹1890 crore ka budget allocate kiya gaya hai. Isse rail network mein improvement aayega aur single track wali problem solve ho jaayegi. Yaani Jamalpur se...
more... Khagaria direction mein Umesh Nagar tak line double ki jaayegi aur yeh line Barauni-Katihar rail line se connect hogi. Iske saath hi, Ratanpur se Munger tak 7 km ki bypass line ko bhi double kiya jaayega. Isse Munger aur Bhagalpur ke beech ki rail services improve ho jaayengi. Budget mein is project ko approve kiya gaya tha aur uske baad survey kiya gaya, jiske liye ₹50 crore allocate kiye gaye the. Ab is project par kaam jaldi hi start hoga.