पूर्वोत्तर रेलवे की ओर से लगाए जा रहे हैं रेन वाटर हार्वेस्टिंग सिस्टमThe Northeast Railway has installed 50 rainwater harvesting systems at 36 locations to conserve water. An additional 18 locations are under construction for the same purpose. To monitor river water levels during the monsoon, water level monitoring systems have been installed on 18 crucial bridges across various sections of the...
more... Northeast Railway. These systems include the bridge over the Gomti River between Aurihar and Varanasi, the bridge over the Ganga River between Varanasi and Prayagraj, and the bridge over the Ghaghra River between Salempur and Indara, among others. The information about water level changes is sent via SMS, facilitating smooth train operations during the monsoon season. The locations of the rainwater harvesting systems include Gorakhpur Railway Officer's Club, Railway Protection Force, Rajhi Camp, Chief Engineer's office, Chief Personnel Officer's office, and Railway Cricket Stadium in Gorakhpur. The installations are also in progress at Azamgarh, Ballia, Belthara Road, Deoria Sadar, Mau, Khorasan Road, and Varanasi City stations in the Gorakhpur division. In the Izzatnagar division, installations are underway at Kathgodam, Haldwani, Kashipur, Rudrapur City, Farrukhabad, Kannauj, Pilibhit, Kasganj, and Lalkuan stations. Finally, the Lucknow division is installing the systems at Lucknow station and Aishbagh Coaching Depot.
Northeast Railway ne pani bachane ke liye 36 jagah pe 50 rainwater harvesting system laga diye hain, aur 18 aur jagah pe lagne ka kaam chal raha hai. Monsoon ke time me river ke water level check karne ke liye Northeast Railway ke alag-alag section pe 18 important pul pe...
more... water level monitoring system laga diye hain. Isme Gomti River pe Aurihar aur Varanasi ke beech wala bridge, Ganga River pe Varanasi aur Prayagraj ke beech wala bridge, aur Ghaghra River pe Salempur aur Indara ke beech wala bridge bhi include hain. Water level badhne-ghanne ki information SMS se milti hai, jisse monsoon ke time me trains smoothly chal sake. Rainwater harvesting system Gorakhpur me Railway Officer's Club, Railway Protection Force, Rajhi Camp, Chief Engineer's office, Chief Personnel Officer's office, aur Railway Cricket Stadium pe laga diye hain. Gorakhpur division me Azamgarh, Ballia, Belthara Road, Deoria Sadar, Mau, Khorasan Road, aur Varanasi City stations pe bhi lagne ka kaam chal raha hai. Izzatnagar division me Kathgodam, Haldwani, Kashipur, Rudrapur City, Farrukhabad, Kannauj, Pilibhit, Kasganj, aur Lalkuan stations pe bhi yeh system lagaaye jaa rahe hain. Aur aakhir me Lucknow division me Lucknow station aur Aishbagh Coaching Depot pe bhi lagne wala hai.