Uttarakhand: देहरादून-सहारनपुर रेल लाइन परियोजना का काम तेज...बनेंगे आठ स्टेशन, लिडार सर्वे से अलाइनमेंट तयThe Dehradun-Saharanpur railway line project, which includes the Shakamberi Devi area, is progressing rapidly. A drone lidar survey, using cutting-edge technology, has been completed covering both the plains and the Shivalik hills. The survey results have enabled the alignment of the proposed railway line and the identification of yard locations. Eight...
more... stations are planned along this route. The detailed project report (DPR) is being prepared, and tenders will be invited soon to lay the rail tracks. Railway Minister Ashwini Vaishnaw announced this project during the Lok Sabha elections, and allocated a budget of ₹2.3 crore for the survey. The DPR is expected to be finalized within 18 months.
Dehradun-Saharanpur rail line project, Shakamberi Devi ko bhi include karke, tezi se aage badh raha hai. Aajkal ki technology wala drone lidar survey, maidan se lekar Shivalik ki pahadion tak, poora ho gaya hai. Survey ke results se propose ki gayi rail line ka alignment aur yard ki jagah decide ho...
more... gayi hai. Is route pe aath station banne wale hain. Project ki DPR taiyar ho rahi hai, aur rail track bhichane ke liye jaldi hi tender aa jayenge. Rail Mantri Ashwini Vaishnaw ne Lok Sabha election mein is project ka announcement kiya tha, aur survey ke liye ₹2.3 crore ka budget bhi de diya tha. 18 mahine mein DPR taiyar hone ka order diya gaya tha.