बिलासपुर रेलवे जोन की 9 ट्रेनें फिर रद्द:भाटापारा–हथबंध सेक्शन में पावर ब्लॉक के चलते ट्रेनों का परिचालन प्रभावितThe South East Central Railway (SECR) Bilaspur zone has announced the cancellation of 9 trains between September 26th and 29th. Additionally, the timings of some trains have been altered. This is due to the construction of a Road Under Bridge (RUB) in the Bhatapara-Hatbandh section of the Raipur Division. The construction...
more... requires launching a relieving girder, leading to traffic restrictions on September 26th, 27th, and 29th. The SECR has also announced route diversions for 4 trains in the Chakradharpur Division between September 25th and 27th due to the construction of a third line at the Adityapur station. Passengers are advised to check train status using NTES/139 to avoid inconvenience.
South East Central Railway (SECR) Bilaspur zone mein 26 se 29 September ke beech 9 trains cancel kar diye gaye hain. Kuchh trains ka time bhi change kiya gaya hai. Ye sab Raipur Division ke Bhatapara-Hatbandh section mein Road Under Bridge (RUB) banane ke liye hai. Is construction ke...
more... liye relieving girder launch karne ki wajah se 26, 27 aur 29 September ko traffic restrictions hain. SECR ne Chakradharpur Division mein bhi 4 trains ka route divert kiya hai 25 se 27 September ke beech, Adityapur station mein third line banane ke liye. Passengers se request hai ki NTES/139 se train status check karke hi travel start karein, taki inconvenience na ho.